...this report presents the results of engineering studies of the proposed infrastructure improvements to be undertaken in the South End urban renewal project; in general, the report provides the reader with the basic concepts of the preliminary design of proposed improvements to streets, parks, lighting, water distribution, sewerage, police and fire alarm, MA Bay Transit Authority (MBTA) facilities, and traffic control systems; also discusses signage (street, traffic and directional) and soil c
...onditions; includes 5 stage timetable with cost estimates for each project improvement; a copy of this item was in the BRA collection..
MoreLess
User Reviews: